ABOUT THE DEVELOPMENT REVIEW BOARD
The Hardwick Development Review Board (DRB) is responsible for ensuring all development in Hardwick is performed in compliance with the Hardwick Unified Development Bylaws. The DRB is currently meeting as-needed – 3-5 times per year. Meetings typically occur on Wednesday nights at 6 p.m.
MEMBERS
- Ruth Gaillard (Term expires 06/30/2027)
- Andrew Gilbert; Vice Chair (Term expires 06/30/2027)
- Joe Nudell (Term expires 06/30/2029)
- Helm Nottermann (Term expires 06/30/2027)
- Kole; Chair (Term expires 06/ 30/2029)
- Daphne Kalmar (Term expires 06/30/2028)
- Peter Moskovitz (Term expires 06/30/2028)
- Grace Johnstone (First Alternate)
DRB AGENDAS, PENDING APPLICATIONS, DECISIONS & MINUTES
|
ZA-Zoning-Review-for-Gravel-Construction-Aubuchon-Hardware-December-2025.pdf
application/pdfZA-Zoning-Review-for-Gravel-Construction-Aubuchon-Hardware-December-2025.pdf Open Download Copy Link 199.82 KB 2026-02-16 February 16, 2026 2025-11-19 November 19, 2025 |
|
Stormwater-Plans-for-Aubuchon.pdf
Stormwater Plans for Aubuchon.pdf application/pdfStormwater Plans for Aubuchon.pdf Open Download Copy Link 2.91 MB 2025-11-19 November 19, 2025 2025-10-29 October 29, 2025 |
|
Site-Plan-for-Aubuchon.pdf
Site Plan for Aubuchon.pdf application/pdfSite Plan for Aubuchon.pdf Open Download Copy Link 1.06 MB 2025-11-19 November 19, 2025 2025-10-29 October 29, 2025 |
|
Floor-Plan-and-Elevations-for-Aubuchon.pdf
Floor Plan and Elevations for Aubuchon.pdf application/pdfFloor Plan and Elevations for Aubuchon.pdf Open Download Copy Link 435.96 KB 2025-11-19 November 19, 2025 2025-10-29 October 29, 2025 |
|
Existing-Conditions-Plan-for-Aubuchon.pdf
Existing Conditions Plan for Aubuchon.pdf application/pdfExisting Conditions Plan for Aubuchon.pdf Open Download Copy Link 1.43 MB 2025-11-19 November 19, 2025 2025-10-29 October 29, 2025 |
|
DRB-Conditional-Use-Decision-for-New-Leaf-Realty-LLC-Gravel-Construction-Signed-12-12-25.pdf
DRB Conditional Use Decision for New Leaf Realty LLC & Gravel Construction - Signed 12-12-25.pdf application/pdfDRB Conditional Use Decision for New Leaf Realty LLC & Gravel Construction - Signed 12-12-25.pdf Open Download Copy Link 2.51 MB 2025-12-13 December 13, 2025 2025-12-13 December 13, 2025 |
6
Zoning & Floodplain Administrator
Kristen Leahy
802-472-1686
zoning.administrator@hardwickvt.gov
Fall 2026 Office Hours
| The Zoning Office will be closed from 11/6/26 to 12/6/26 for medical leave. | |
| Outside of daily stated hours, by appointment. |